FINAL INSPECTION


The following items will need to be completed prior to requesting a final inspection of your now home:
  1. All exterior doors must be equipped with the required egress landings. This includes the 36!'x 36" landing, stairs and rails as required. Decks may substitute for landings.
  2. Interior stairs, rails and barriers must be installed.
  3. A functioning kitchen must be installed.
  4. At least one bathroom must be complete; lavatory, water closet and tub or shower.
  5. Properly wired smoke detectors must be installed.
  6. Garage/house smoke wall must be complete.
  7. All electrical, water, sewer (septic), gas connections, must be completed.
  8. A means of providing heat must be provided.
  9. Street address must be posted in accordance with Ordinance # 628.
  10. Final Inspection checklist must be completed and submitted to the Building Department.